Mechanical Expert

Consultancy for “Conducting consultancy studies for rehabilitation and revamping works including preparation of Detailed Project Report (DPR), process designs and detailed estimates, preparation of bid documents
Application deadline closed.
Application deadline closed.

Job Description

1. Conducting prefeasibility studies to rehabilitate the existing 300 MLD Water Treatment Plant and Surapet Water Treatment Plant and also to enhance the Treatment quantity by drawal of sufficient quantity water from Redhills lake.
2. Topographic Survey of the site and preparation of topo – drawings.
3. Soil Investigation Report, rainfall, wind and temperature.
4. Analyze the quality of the Raw water and study the characteristics of raw water by doing lab analysis.
5. Study the 300 MLD Water Treatment Plant and Surapet Water Treatment Plant design (Physical and Functional)
6. Refer TOR for more details.

Project Description

The objective of the consultancy is to conduct studies for rehabilitation and modification works including preparation of DPR, process designs and detailed estimates for the existing 300MLD Water Treatment Plant and 14MLD Surapet Water Treatment Plant in Puzhal and Surapet respectively in Chennai.

Screening Criteria 1
Master's Degree in Mechanical Engineering
Screening Criteria 2
Overall Years of Experience (min):10
Screening Criteria 3
Should have served as Project Consultant for a minimum period of 3 years in Water Treatment Plants of not less than 75 mld capacity.