Job Description
1. Conducting prefeasibility studies to rehabilitate the existing 300 MLD Water Treatment Plant and Surapet Water Treatment Plant and also to enhance the Treatment quantity by drawal of sufficient quantity water from Redhills lake.
2. Topographic Survey of the site and preparation of topo – drawings.
3. Soil Investigation Report, rainfall, wind and temperature.
4. Analyze the quality of the Raw water and study the characteristics of raw water by doing lab analysis.
5. Study the 300 MLD Water Treatment Plant and Surapet Water Treatment Plant design (Physical and Functional)
6. Refer TOR for more details.
Project Description
The objective of the consultancy is to conduct studies for rehabilitation and modification works including preparation of DPR, process designs and detailed estimates for the existing 300MLD Water Treatment Plant and 14MLD Surapet Water Treatment Plant in Puzhal and Surapet respectively in Chennai.