Job Description
1. Specification of details of the layout of the marina to be integrated with the river bank protection wall for the Devbag (Creekside) subproject.
2. Evaluate the site conditions
3. Design Berthing systems, pier and pontoon
4. Provide conceptual design for utilities and safety equipment integration
5. Provide waterfront development, commercial outlets and infrastructure development concepts
6. Should work with the ‘River Bank Protection Designer’ to ensure the right choice of the material or protection wall, entrance to the embedded marina, size and layout of the marina, height of the marina wall and interface with the land side.
7. Prepare material specifications and quantities required for the marina with the help of the Deputy Team Leader and the Coastal Engineer