Job Description
The duty of the Solid Waste Management Expert is to review analytically the present waste management system and evaluate the lacking sustainable elements and to review waste management practices and consider issues for improving Waste Management System. He will be responsible for all surveys including fresh and legacy waste quantification & characterization, exploring various options for reclamation of project site, all engineering aspects, costing etc. for the proposals.
Project Description
1. Preparation of Detailed Feasibility Report (DFR), bid documents, legal documents, proceedings, communication note, project structuring documents etc. as required by the GCC and strictly adhering to TNID Act ,TNTT Act , SWM Rules, all relevant Environment& other rules for developing Eco Park, Setting up of Mega Bio CNG plant, Composting plant & Mega Automated MRF facilities, Bio mining of Fresh waste accumulated during the development of the facilities, in the reclaimed land including demarcation of boundary, preparation of site layout showing the existing and proposed SWM facilities at Perungudi Dumping Ground.
2. To prepare the Request for Expression of Interest (REOI), Request for Qualification (RFQ), Request for Technical Proposal (RTP), Request for Proposal (RFP), Concession agreement or Agreement and other documents, forms, applications etc. for different packages as per the requirement of GCC / GoTN.
3. To study in detail the technical, financial, legal, regulatory, environmental and social feasibility of the project on a sustainable basis.
Screening Criteria 1
A post- graduate in environmental / public health engineering
Screening Criteria 2
With minimum 15 years of experience in design of municipal solid waste treatment facilities and experience in multilateral assisted projects.