Job Description
The Tasks: (i) Identifying regulatory clearance requirements and finalizing the documentary requirement in obtaining the same; (ii) Preparing EMP / site specific Environmental Plan (ii) Preparing IEE & EMP; ensure that IEE reflects the final design. (iii) Suggest mechanisms to redress the complaints such that the complaints/grievances are addressed in a timely manner and resolutions are properly documented when encountered during implementation; (iv) carrying out consultations (iv) Assistance in any other environmental safeguard related tasks as required.
Project Description
1. Preparation of Detailed Feasibility Report (DFR), bid documents, legal documents, proceedings, communication note, project structuring documents etc. as required by the GCC and strictly adhering to TNID Act ,TNTT Act , SWM Rules, all relevant Environment& other rules for developing Eco Park, Setting up of Mega Bio CNG plant, Composting plant & Mega Automated MRF facilities, Bio mining of Fresh waste accumulated during the development of the facilities, in the reclaimed land including demarcation of boundary, preparation of site layout showing the existing and proposed SWM facilities at Perungudi Dumping Ground.
2. To prepare the Request for Expression of Interest (REOI), Request for Qualification (RFQ), Request for Technical Proposal (RTP), Request for Proposal (RFP), Concession agreement or Agreement and other documents, forms, applications etc. for different packages as per the requirement of GCC / GoTN.
3. To study in detail the technical, financial, legal, regulatory, environmental and social feasibility of the project on a sustainable basis.
Screening Criteria 1
Post graduate in Environmental Science/ Engineering / Planning
Screening Criteria 2
With overall experience of 10 years in EIA studies and implementation of EMPs, of which a minimum of 3 years shall be on infrastructure projects funded by multilateral organizations like ADB